November 2026 · Engineering development update
PARNIK has completed the engineering development phase of its eight-channel network relay module. The team evaluated prototype switching and communications. Production qualification and a controlled pilot are the next steps.
Download the full public report (PDF)
Contents · 14 sections
- 1. Executive Summary
- 2. Project Objectives
- 3. Product Positioning and Application Scope
- 4. Functional Architecture
- 5. Project Execution Summary
- 6. Completed Product Capabilities
- 7. Prototype Development References
- 8. Deliverables Status
- 9. Validation Summary
- 10. Engineering Outcomes
- 11. Current Status and Release Readiness
- 12. Next-Stage Action Plan
- 13. Project Conclusion
- 14. Approval
Final Project Progress and Completion Report
Design and Development of the PARNIK-IP-C8 8-Channel Network Relay Module
Industrial Ethernet and RS-485 relay control platform supporting Modbus TCP and Modbus RTU communication
Development prototype. The approved engineering package defines the final release configuration.
| Project information | Details |
|---|---|
| Edition | Public engineering report |
| Prepared by | Parnik Technologies Inc. |
| Project / Product model | Network Relay Module / PARNIK-IP-C8 |
| Project status / Release status | Development phase completed / Production release pending |
| Version / Issue date | 1.2 / November 19, 2026 |
Copyright
This report is proprietary to PARNIK TECHNOLOGIES, INC. and is protected by copyright. No information contained herein may be copied, translated, transcribed or duplicated for any commercial purposes or disclosed to a third party in any form without the prior written consent of PARNIK TECHNOLOGIES, INC.
Document Control
Scope, status, revision, and source basis
| Control field | Record |
|---|---|
| Document title | Final Project Progress and Completion Report |
| Project / Model | Network Relay Module / PARNIK-IP-C8 |
| Edition | Public engineering report |
| Prepared by | Parnik Technologies Inc. |
| Version / Date | 1.2 / November 19, 2026. Previous issue: 1.1 / November 18, 2026. |
| Completion definition | Core engineering development scope completed. Production-release activities remain a controlled next stage. |
| Source basis | Two management progress reports supplied by Parnik Technologies Inc., as consolidated in revision 1.1. |
Readiness terminology used in this report
“Completed” refers to the defined development phase: requirements, architecture, electrical design, PCB/hardware development, prototype-level verification, mechanical review, and documentation. It does not represent third-party certification or unrestricted production-release approval.
1. Executive Summary
Parnik Technologies Inc. has completed the defined engineering development phase for the PARNIK-IP-C8 Network Relay Module, a network-enabled relay control platform intended for remote switching through Ethernet and RS-485 communication interfaces. The product definition includes eight independent relay output channels, Modbus TCP and Modbus RTU support, and integration pathways for PLC, SCADA, industrial control, agricultural automation, and intelligent-building environments.
The reported project scope covered requirements definition, functional architecture, electrical schematic development, PCB and hardware design, prototype evaluation, mechanical and installation review, and supporting technical documentation. These activities establish a structured engineering baseline and allow the project to proceed into production engineering, controlled pilot deployment, formal compliance testing, and commercial release preparation.
This report records the development work described in the two management reports and identifies the evidence needed for production release. Sections 8 and 9 link each deliverable and verification area to its reported status and outstanding release records.
| Area | Status | Area | Status |
|---|---|---|---|
| Development phase | Completed | Prototype verification | Completed within reported scope |
| Production release | Next stage | External certification | Not included in source reports |
| Final datasheet / manual | Next stage | Pilot deployment | Recommended |
Project Definition
Objectives, application scope, and product positioning
2. Project Objectives
The strategic objective was to create a reliable, scalable, and industrially compatible relay-control platform that can operate as either an output expansion interface within a larger automation system or as a standalone network relay controller.
Develop an eight-channel relay-control module for remote electrical switching applications.
Provide dual communication capability through Ethernet and RS-485.
Support Modbus TCP and Modbus RTU as widely adopted industrial communication protocols.
Enable integration with PLC, SCADA, supervisory control, and smart automation systems.
Support industrial panel installation and a DIN-rail-oriented mechanical concept.
Establish a maintainable platform suitable for future product-line expansion and derivative models.
3. Product Positioning and Application Scope
The PARNIK-IP-C8 is positioned as a smart output-control module for applications where remote switching, protocol compatibility, and integration flexibility are required. The product may operate as a distributed relay controller or as a controlled output layer within a larger industrial system.
| Application | Intended use |
|---|---|
| Industrial control | Electrical panels, PLC/SCADA environments, and distributed automation |
| Facilities and infrastructure | HVAC, ventilation, lighting, pumps, heating systems, and data centers |
| Agricultural automation | Smart greenhouses and poultry-farm environmental control |
| Buildings | Building-management systems and intelligent infrastructure |
| System role | Standalone controller or output-expansion interface |
4. Functional Architecture
The product architecture separates power, control, communication, output-drive, and relay-switching functions. Ethernet provides LAN-based command and Modbus TCP connectivity, while the RS-485 interface provides Modbus RTU communication. The controller processes commands and drives the eight output channels through the relay-output stage.
Figure 1. PARNIK-IP-C8 functional command path. The approved schematic and firmware configuration govern the detailed implementation.
The arrows trace an incoming switching command. The power supply provides the internal operating voltages for the module.
Engineering Execution
Completed work packages and technical deliverables
5. Project Execution Summary
5.1 Requirements Definition
Functional, communication, environmental, and installation requirements were identified, reviewed, and formalized to align product intent with engineering execution.
5.2 System Architecture Development
The principal functional blocks were defined, including power supply, controller, Ethernet communication, RS-485 communication, output driver, and relay switching.
5.3 Electrical Design
The electrical schematic was developed with attention to reliability, protocol compatibility, maintainability, and suitability for industrial operating environments.
5.4 PCB and Hardware Design
Component placement, routing, electrical-domain separation, EMC-related design considerations, safety, serviceability, and manufacturability were addressed at the hardware-design level.
5.5 Mechanical and Installation Review
Connector accessibility, serviceability, enclosure compatibility, and the DIN-rail-oriented installation concept were evaluated for panel-based deployment.
5.6 Prototype Validation
Prototype-level evaluation was carried out to verify relay operation, communication functionality, and compatibility within the intended application scope.
5.7 Technical Documentation
Product descriptions, engineering presentation material, and supporting documentation were prepared for management review, customer communication, and release planning.
6. Completed Product Capabilities
| Capability | Implementation scope | Project outcome |
|---|---|---|
| Relay outputs | Eight independent control channels | Defined within PARNIK-IP-C8 product configuration |
| Ethernet | LAN communication interface | Supports remote network-based switching |
| RS-485 | Serial industrial communication interface | Supports field integration |
| Modbus TCP | Ethernet-based industrial protocol | Included in product communication scope |
| Modbus RTU | RS-485-based industrial protocol | Included in product communication scope |
| PLC / SCADA integration | Protocol-level compatibility | Suitable for supervisory and automation systems at the protocol level |
| Mechanical concept | Industrial panel / DIN-rail-oriented installation | Prepared for production-engineering refinement |
Prototype Evidence
Supplied photographic references and configuration control
7. Prototype Development References
The two photographs supplied for this report show different prototype configurations and mechanical layouts. They document stages of hardware development. The source records do not identify a tested unit or hardware revision for either photograph. The final channel count and release configuration are defined in the controlled engineering records.
Figure 2. Prototype development references from the two photographs supplied by Parnik Technologies Inc.
Configuration-control note
The final PARNIK-IP-C8 channel mapping, electrical characteristics, manufacturing configuration, and production status must be established from the approved schematic, bill of materials, firmware baseline, assembly drawings, and formal release record—not by visual inspection of prototype photographs.
7.1 Photographic Use in the Final Release Package
Before commercial launch, the release package should include controlled photography of the final approved production revision. Each image should identify the product model, hardware revision, and configuration status, and should be traceable to the release BOM and schematic.
Linking a photograph to a tested unit
For the release record, identify the photographed unit by serial number or prototype ID and record the enclosure and PCB revisions. Use the same unit identifier on its test sheet and reference the firmware build installed for the test. This allows a reviewer to connect each result to a specific physical configuration.
Verification and Readiness
Deliverables, reported validation, limitations, and release controls
8. Deliverables Status
| Deliverable | Status | Evidence basis | Release note |
|---|---|---|---|
| Requirements definition | Completed | Reported in both source documents | Maintain under revision control |
| System architecture | Completed | Functional blocks defined | Freeze with release baseline |
| Electrical schematic | Completed | Reported as finalized | Assign controlled revision identifier |
| PCB / hardware design | Completed | Layout and design activities reported complete | Complete DFM/DFT review before production |
| Prototype evaluation | Completed within reported scope | Communication and relay operation evaluated | Retain detailed test records in evidence pack |
| Mechanical review | Completed at concept level | Accessibility and enclosure compatibility reviewed | Finalize production enclosure and mounting hardware |
| Technical documentation | Completed for management reporting | Descriptions and presentation content prepared | Finalize user manual and product datasheet |
| External compliance report | Not included | No third-party evidence supplied | Required before formal production release under the project plan |
| Production BOM / manufacturing pack | Next stage | Not listed as a completed release artifact | Freeze BOM, Gerbers, assembly files, and test procedure |
Engineering file references
When the production baseline is frozen, record the document number and revision of each controlled item above. The bill of materials (BOM), PCB fabrication files (Gerbers), firmware build and assembly drawings should all refer to the same product revision. Record the outcomes of the design-for-manufacture and design-for-test reviews (DFM/DFT) against that baseline.
9. Validation Summary
Reported prototype results and supporting release evidence
| Verification area | Reported result | Required evidence for release |
|---|---|---|
| Ethernet communication | Functional verification reported | Test procedure, network conditions, logs, and acceptance criteria |
| RS-485 communication | Functional verification reported | Baud/configuration matrix, line conditions, and test records |
| Modbus TCP / RTU | Protocol support implemented and evaluated | Register map, exception handling, interoperability test results |
| Relay operation | Prototype switching operation evaluated | Per-channel functional test and simultaneous-output test |
| PLC / SCADA compatibility | Compatibility established at protocol level | Controlled integration test with representative systems |
| Mechanical suitability | Accessibility and installation considerations reviewed | Final enclosure, DIN-rail hardware, drawings, and assembly check |
| EMC / ESD / electrical safety | No external report included | Formal compliance plan and third-party/qualified laboratory evidence |
| Endurance / thermal performance | No quantified results included | Burn-in, relay-cycle, load, temperature, and recovery testing |
Prototype test evidence available for this report
| Record field | Information available |
|---|---|
| Tested unit, PCB revision and firmware build | Identifiers were not supplied in the reporting material. |
| Test date, operator and log reference | No dated test sheet, operator name or log identifier was supplied. |
| Results for channels 1–8 | Switching was reported at prototype level. Individual channel results over each interface were not supplied. |
| Simultaneous operation | No result was supplied for all eight outputs active together. |
For each verification run, record the unit and firmware identifiers, command issued, expected state, observed contact state, applied load and pass/fail decision. For a simultaneous-output run, also record the supply and load conditions and any unexpected switching or reset.
Management Conclusion
Engineering value delivered, controlled next steps, and formal approval
10. Engineering Outcomes
A stable functional hardware architecture was established across power, control, communication, and relay-output domains.
Dual communication capability was implemented through Ethernet and RS-485 interfaces.
Modbus TCP and Modbus RTU were incorporated into the product communication scope.
The design was structured for industrial integration, serviceability, and future scalability.
The project produced a viable engineering baseline for production planning and derivative product development.
11. Current Status and Release Readiness
The core engineering development phase is complete. The project has reached a controlled transition point at which the design can move into production engineering and release preparation. This status supports business planning, customer demonstration, investor presentation, and controlled pilot activities; it should not be interpreted as evidence that every manufacturing, compliance, endurance, and field-validation requirement has already been closed.
12. Next-Stage Action Plan
1. Freeze the product revision and establish a controlled release baseline for schematic, PCB, firmware, and mechanical configuration.
2. Complete the production BOM, DFM/DFT review, assembly documentation, programming procedure, and end-of-line test specification.
3. Execute and document electrical safety, EMC/ESD, thermal, endurance, and recovery testing appropriate to the intended markets.
4. Run a controlled pilot deployment with issue logging, corrective-action tracking, and formal acceptance criteria.
5. Finalize the product datasheet, Modbus register map, installation guide, user manual, warranty scope, and release package.
6. Conduct a production-readiness review and approve commercial launch only after required evidence has been accepted.
Implementation of the Action Plan
Proposed responsibilities, timing, and completion criteria for section 12
The following roles and milestone targets are proposed for planning. Named assignees and calendar dates can be recorded once PARNIK confirms resources and the pilot scope.
| Action | Proposed lead | Target milestone | Completion criterion |
|---|---|---|---|
| 1. Freeze revision | Hardware and firmware leads | Before pilot procurement | Schematic, PCB, firmware and enclosure revisions recorded under a single baseline. |
| 2. Prepare production files | Manufacturing engineering | Before pilot assembly | BOM, assembly and programming instructions released for the build. DFM/DFT findings and end-of-line test specification reviewed. |
| 3. Verify design | Verification and compliance leads | Define requirements before pilot installation and close qualification before release | Dated test results linked to the tested unit. Applicable market requirements, limits, deviations and dispositions recorded. |
| 4. Conduct pilot | Pilot lead and site representative | After bench acceptance | Site, pilot unit, trial period and acceptance criteria agreed. Issues and corrective actions recorded and reviewed. |
| 5. Finalize documents | Product engineering | Before release review | Datasheet, register map, installation guide, manual and warranty scope checked against the release revision. |
| 6. Decide release | Engineering and management | After pilot and qualification review | Decision recorded against the evidence pack, including the disposition of any outstanding items. |
13. Project Conclusion
Development-phase conclusion and management approval
The Design and Development of the PARNIK-IP-C8 8-Channel Network Relay Module has achieved the objectives defined for the engineering development phase. The project has produced a structured network-relay platform with Ethernet and RS-485 connectivity, Modbus TCP and Modbus RTU support, eight-channel output-control capability, and clear integration relevance for industrial, agricultural, facilities, and intelligent-building applications.
From an engineering and project-management perspective, the development phase can be considered successfully completed. The recommended next step is a disciplined transition into production engineering, compliance verification, pilot validation, and formal release control. This approach preserves the commercial value of the completed work while ensuring that future production-readiness claims are supported by objective evidence.
Final management statement
The project has delivered a technically structured and commercially relevant product baseline consistent with the original development intent. Production engineering, qualification and a controlled pilot form the next stage of the project.
14. Approval
PARNIK Technologies Inc. recorded completion of the engineering development phase on November 18, 2026. Production release remains pending. This public edition presents the technical scope and development status for project stakeholders.